OCEAN OBSERVATION / BUOY
HY-FB-GX01
Long-term measurements from a stable platform.
A 2 m moored buoy for long-term optical, water-quality and weather observation, designed to stay level in wind and waves.
Get a configuration & quote
Manufacturer product rendering · Boya GongdaoTECHNICAL STARTING POINT
Key specifications.
- Buoy diameter
- 2 m
- Design draught
- 1.25 m
- Water depth
- 3–30 m
- Design life
- 10 years
- Wind speed
- ≤ 60 m/s
- Wave height
- ≤ 10 m
- Surface current
- ≤ 3.5 m/s
- Temperature
- −10 to +55 °C
Tasks to assess
- Long-term fixed-point monitoring of coastal water and weather
- Monitoring of ecologically sensitive areas
- Environmental monitoring around marine construction
Configuration checks
- Select the measured parameters; the data logger is a custom module.
- Confirm mooring design for the site depth, tide and current.
- Decide where data is stored; cloud hosting is optional and local storage should be available.
COMPLETE SYSTEM
Specify more than
the vehicle.
The system includes the mooring, a custom data logger, wireless transmission, battery and solar panels, data-receiving software and watertight cables. Measured parameters can include air temperature, pressure, wind, humidity, solar radiation, water temperature, conductivity, salinity, turbidity and chlorophyll. Radio certification for the target country is confirmed per project.
Confirm in the delivered scope
- Buoy body, mooring and watertight cabling
- Data logger and selected sensors
- Wireless transmission, battery and solar power
- Data software and platform
- Deployment, calibration plan and maintenance schedule
Standard, optional and custom items must be listed separately in the quotation.
QUESTIONS
Before you specify the HY-FB-GX01.
What does it measure?
The logger is configured per project. The catalogue lists weather (air temperature, pressure, wind, humidity, solar radiation) and water parameters (temperature, conductivity, salinity, turbidity, chlorophyll and other water-quality data).
Where does the data go?
The data platform offers real-time display, maps and user permissions, with optional cloud service. Agree local storage and data ownership before deployment.
PROCUREMENT
Prepare the next review.
Agree the site conditions, acceptance test, delivery scope and support responsibilities. Product names and rated figures alone are not a project specification.
HY-FB-GX01 starting brief
Download a concise summary of the specifications and project questions shown here. This is a selection aid, not a factory-approved datasheet.
Download product briefFROM TASK TO CONFIGURATION
Bring your project into focus.
Share the task, site conditions and required results. Build a clear brief for system selection.